A new Costco tends to make people either very happy or a little nervous. Both reactions make sense. Here’s what the City’s own documents say about the project, where it is in the approval process, and the practical questions I’d think about if I were buying near it.
What’s proposed
According to the City’s Notice of Preparation (the document that starts the environmental review), Costco proposes a 159,889-square-foot warehouse and a fueling station at 200 South Kraemer Boulevard on an 18.65-acre site [S17]. The plan includes:
- Typical Costco departments: bakery, meat, pharmacy, optical, hearing aids, food service, a tire center and a food court [S17].
- A gas station with 20 fuel islands and 40 pumps under a canopy on the western part of the site [S17].
- 943 parking spaces, with driveways on East Birch Street, South Kraemer Boulevard and Ranger Street. Trucks would come mainly from Ranger Street [S17].
- Anticipated warehouse hours of 9:00 a.m. to 8:30 p.m. weekdays, 8:30 a.m. to 6:00 p.m. Saturday and 9:00 a.m. to 6:00 p.m. Sunday; gas station hours of 5:00 a.m. to 10:00 p.m. weekdays, 6:00 a.m. to 8:00 p.m. Saturday and 6:00 a.m. to 7:30 p.m. Sunday [S17].
- About 90 jobs, per the state’s CEQAnet listing [S21].
Today the site has three occupied buildings totaling about 247,000 square feet: a medical training laboratory, a medical lab equipment manufacturer and a corporate office. They would be demolished [S17].
Where it is, and who’s next door
The site is bounded by East Birch Street to the north, Ranger Street to the east, South Kraemer Boulevard to the west and the Beckman Coulter office plaza to the south [S17]. Across Birch Street are single-family homes, and to the northeast are Olinda Elementary School and Brea Sports Park [S17]. That matters for Brea 265 families: the district hasn’t assigned Brea 265 to schools yet, but the site sits largely within Olinda Elementary’s historical attendance area (see our schools map).
It’s roughly 1.5 miles west of Brea 265 [S17]. See it in context on our What’s Nearby map.
Where it is in the approval process
Nothing has been approved. Here is the sequence so far:
| Date | Step |
|---|---|
| Dec 16, 2025 | City Council approves, 3–1, a sales-tax-sharing Economic Development Agreement. The City says this is not a land-use approval [S20] [S18]. |
| Oct 5, 2026 | City issues the Notice of Preparation of an Environmental Impact Report [S17]. |
| Oct 15, 2026 | Public scoping meeting [S18]. |
| Nov 5, 2026 | Comment period on the scope of the EIR closes [S17] [S21]. |
| Expected summer 2027 | Draft EIR released for public review, per the City [S18]. |
| Expected fall 2027 | Planning Commission hearing, per the City [S18]. |
The application was filed before the City’s Brea 2050 general plan update and was grandfathered under the older Light Industrial (M-1) designation. It still needs Planning Commission approval of a conditional use permit, plan review and a tree removal permit [S17]. The EIR will study aesthetics, air quality, noise, transportation, hazards, public services and other topics [S17].
Possible upsides for nearby homeowners
For many households, a nearby warehouse store and gas station is simply convenient. Brea already has a lot of retail: the Census Bureau’s 2022 Economic Census counted about $47,178 in retail sales per resident in Brea, far more than nearby cities [L6]. The City’s sales-tax agreement suggests it expects the store to add tax revenue [S20], though the details of how that revenue gets used are up to the City.
Trade-offs to think about
The flip side is activity. A store with 943 parking spaces and a 40-pump gas station will bring more cars to Birch Street, Kraemer Boulevard and Ranger Street, and early-morning gas station hours mean activity from 5:00 a.m. on weekdays [S17]. If you’re looking at a home near the site, these are the things the Draft EIR should quantify: traffic at nearby intersections, noise, lighting and truck routes [S17].
What I can’t tell you is what it will do to home values. I haven’t found a reliable local study, and I won’t pretend to know. Proximity tends to be a matter of taste: a short drive is a plus, a view of the parking lot is not.
How to stay informed or weigh in
- Watch for the Draft EIR, expected in summer 2027 [S18]. It will have a public comment period; comments become part of the record.
- Check the City’s Projects in Process page for updates [S18], and the state’s CEQAnet listing (SCH 2026100301) for filed documents [S21].
- Attend the Planning Commission hearing when it’s scheduled, expected in fall 2027 [S18].
- If you’re buying near the site, drive Birch and Kraemer at the times you’d commute, and read the Draft EIR’s traffic and noise sections once they’re out.
This guide is general information, not legal, tax, insurance or lending advice. Builder policies, incentives, taxes and loan programs vary and change. Confirm anything that matters in writing with the builder, your lender, your insurance agent and a qualified tax or legal professional.
Sources for this page
- [L6] U.S. Census Bureau QuickFacts: Brea, Fullerton, Yorba Linda, La Habra and Chino Hills (V2025 population estimates; 2020–2024 ACS 5-year estimates) (retrieved Nov 17, 2026)
Citations like [S24] point to the Brea 265 source list on our Sources page.